  • Which of the following are the three basic fiscal constraints for appropriated funds?
  • What is the difference between obligation and commitment of funds?
  • Under the FAR 52.215-8 order of precedence, which document takes precedence when the Specifications conflict with the Schedule (excluding specifications)?
  • Who is responsible for the cost of repair of Government Furnished Property?
  • What does the Berry Amendment do?
  • What mentoring method is described for a new Contract Specialist?
  • Where is information about the COR program located?
  • Which CPARS requirement is essential when giving a rating other than Satisfactory?
  • Which regulation references the limitation on the architect-engineer contract price for design services?
  • What is the threshold for Justification for Sole Source Award to 8(a)?
  • For a non-ANC 8(a) company, what is the sole-source ceiling?
  • What does the lead-time exception relate to in incremental funding, and why did it not apply in the CY13 computer example?
  • What are some of the benefits of competition in federal contracting?
  • How is an Unsolicited Proposal defined?
  • Which of the following is an example of an inherently governmental function?
  • Which of the following is a bona fide measurement of the Bona Fide Need Rule for appropriations?
  • Who appoints the Source Selection Authority for contracts valued between 100 million and 500 million?
  • Which elements are included in performance-based requirements?
  • Which action would constitute a violation of the Anti-deficiency Act?
  • Which is NOT an exception to certified cost & pricing for actions over $2M?
  • What is the act of approving an unauthorized commitment called?
  • Under what condition may the KO withhold payment on a contract?
  • OCI stands for which term in contracting context?
  • When should a Letter Contract be issued?
  • When evaluating whether to use year-end funds to purchase replenishment spares, what two major concerns must you address?
  • Which of the following is commonly cited as an inadequacy in requirements or PWS that could reduce competition?
  • Small Business is selected to be awarded a contract, but they do not meet the responsibility criteria - what must you do?
  • Threshold and approval for D&F for 'Use of letter contracts (undefinitized contract actions)'
  • Which law’s violations are listed as grounds to withhold payments on a contract?
  • Severable services may be funded in what manner?
  • Which official approves the Justification and Approval (JA) for contract actions up to $750,000?
  • What are the exceptions to the Fair Opportunity to Compete concept for orders under multiple-awards contracts?
  • Which actions are prohibited for a debarred contractor unless the agency head makes a written determination?
  • In Design Build procurement, what is the primary advantage?
  • Which source selection process allows for a tradeoff between non-cost factors and cost/price to achieve best value?
  • Which of the following is NOT a stated purpose of FPDS-NG Contract Action Reports (CARs)?
  • Who maintains contractual authority for contracts under the SAT?
  • Which item must not be disclosed in a pre-award debriefing?
  • UCF stands for what?
  • Which threshold triggers formal acquisition planning requirements?
  • What fiscal issue arises when a PCO uses FYXX O&M funds to acquire computers that could be delivered immediately, but are intended for a future building?
  • Define Severable and Non-severable services and differentiate between the two.
  • Which office provides written legal sufficiency for bid-related issues?
  • Which of the following statements about Blanket Purchase Agreements is true?
  • Bona Fide Needs rule: In severable services, when must service begin?
  • A Blanket Purchase Agreement can be used only if no existing requirements contract exists for the same supply/service.
  • Which statement is true regarding AQC Plan and Acq Strategy usage?
  • Which statement correctly characterizes non-severable service contracts?
  • Who may delegate certification authority for requirements valued less than what amount?
  • Which statement correctly describes non-severable versus severable service contracts in terms of funding and period of performance?
  • What does D&F stand for in option exercise determinations?
  • What is Phase One in the Two-Phase Design Build Selection Procedure?
  • How many phases are listed for PDBP?
  • Under Buy American Act guidance, when should FAR 52.225-9 be included?
  • Which statement best describes the authority of a Contracting Officer?
  • Which item is NOT listed as a benefit of competition?
  • If preparing to exercise an option year on a contract, what must you have to exercise the option?
  • Phase One is based on qualification proposals; Phase Two is limited to the most highly qualified firms that submit technical proposals and may include preliminary design and price proposals. Which description matches this process?
  • If negotiations reveal errors in the Government estimate, what action is required?
  • Which modification is typically bilateral?
  • When must a BCOES be received?
  • Is it permissible to have a non-Government contractor employee as chief of the technical evaluation team and a voting member of the source selection board?
  • Congressional notification is required for awards above what amount, and who approves?
  • What does performance-based mean?
  • BCOES applicability applies to which type of contracts?
  • What is a personal services contract?
  • Which statements describe an Administrative Contracting Officer under USACE?
  • What happens in Phase Two of the Two-Phase Design Build selection?
  • What makes a contractor responsible?
  • In simplified acquisitions, when is a contract established?
  • Which statutory authority corresponds to permitting contracting without full and open competition due to a sole-source requirement?
  • If a contractor is debarred, suspended, or proposed for debarment, what is allowed regarding contracts in existence at the time of debarment?
  • Under DFARS, when can a fixed-price contract be incrementally funded with funds from multiple fiscal years?
  • Which statement best describes a Certificate of Current Cost or Pricing Data?
  • The depth of pre-negotiation analysis should relate to which factors?
  • Under IAW UAI, which authority approves an award for Military Construction if the IGE exceeds 15%?
  • For non-commercial procurements over $750k, what data are required and what analysis is performed?
  • Under water procurement policy, when may bottled water be purchased?
  • What does HCA stand for?
  • Who makes the final Source Selection decision and writes the SSDD?
  • When should a COR be nominated in the acquisition process?
  • Which body may review agency decisions to determine whether a function is inherently governmental?
  • In two-phase selection procedures, phase-one may be issued with what type of information?
  • A UCA may remain unsettled for up to how many months?
  • Before negotiation, which prices must POM include?
  • If a small business appears to be the apparent awardee but cannot be determined responsible, what action should you take?
  • What is the maximum allowed proposal price above the IGCE for Civil Works Contracts?
  • The Price Negotiation Memorandum (PNM) serves what purpose?
  • Brand-name descriptions, and other descriptions that permit offers of products other than those named, provide for full and open competition and do not require justifications.
  • Which statement best describes a non-personal services contract?
  • What is the general applicability of Project Labor Agreements (PLAs)?
  • In CPARS, what is the purpose of the small business narrative?
  • Define an Excusable Delay.
  • Which contract type places full responsibility for performance costs and resulting profit on the contractor?
  • If a Davis-Bacon wage rate changes after a source selection decision has been made but before award on a construction RFP, what must you do?
  • When evaluating whether Contractor A can bid as a prime on a new source selection while they will provide testing under the current contract, which factor must be avoided?
  • Which set of elements constitutes a binding contract?
  • In Design Bid Build, how are the owner’s contracts arranged?
  • Design Build procurement will always use a two-step process, consisting of receiving capabilities and receiving proposals.
  • Which statement correctly describes Progress Payments under FAR 32.104?
  • Which statement describes a key purpose of a Blanket Purchase Agreement?
  • Where is information on Inherently Government Functions located?
  • Which official approves the JA for actions greater than $100,000,000?
  • Who must authorize in writing compelling reasons for renewal or extension of current contracts with a debarred contractor?
  • What are the standard minimum synopsis and solicitation posting durations for construction procurements?
  • Which statement best describes severable services?
  • Who approves the Acquisition/Contract Strategy for values less than $93 million?
  • Which statement correctly describes bundling and consolidation?
  • What is the dollar threshold that establishes the need for a Department of Labor wage determination?
  • Which statement best describes clarifications in the context of the source selection?
  • Discussions, clarifications, and communications differ in that discussions require what?
  • Which reference is cited for threshold and approval for determination of consolidation?
  • Formal acquisition plans are required for programs with total cost at least how much?
  • Which outcome is most likely from performing a BCOES review before construction contracts?
  • Under two-phase procedures, the Phase-Two procurement is issued after Phase-One and includes the remainder.
  • Which system should be discontinued for transmitting/receiving proposals according to policy?
  • For a two-phase design-build selection, what is the threshold amount for a determination that having more than five offerors is in the Government's interest?
  • Which of the following is NOT listed as one of the seven exceptions that allow non-competitive award?
  • The clause 'Conditions upon availability of funds' is included in which contract clause?
  • Who is the district chief of contracting?
  • Which item is included in a post-award debriefing (when applicable)?
  • How are GFP adjustments handled during contract administration?
  • What is the objective of the determination to reject offers suspected of being collusive when the disclosure was made to restrict competition?
  • Which statement best reflects the six percent limitation for AE design costs and what is included?
  • For urgent procurements, which J&A element must be included?
  • In FAR Part 15, what procedures are used to weigh a PLA against other offers?
  • Who approves the ratification authority for contract actions greater than $100,000?
  • Explain the legal effect of quotes and how a contractor indicates acceptance of a purchase order.
  • Which option describes the proper method to address an organizational conflict of interest in a solicitation?
  • A bridge contract is best described as which of the following?
  • Which statement best describes LPTA?
  • What does the acronym ACO stand for in this contracting context?
  • Under FAR 45, can GFP be included in a solicitation and the resulting contract, and what steps are necessary?
  • If you disagree with the Office of Counsel, what is the recommended action?
  • Which official approves the JA for actions between $15,000,000 and $100,000,000?
  • What is a key rule for OMA funds regarding cross-year obligations?
  • Who is the USACE Ombudsman and what is the protest threshold?
  • Who signs RFP letters for construction modifications above the ACO warrant threshold?
  • In Design Bid Build, when must BCOES be signed and prepared?
  • Under what condition can full and open competition be bypassed for an unsolicited proposal?
  • For acquisition strategy of not performance-based services, what threshold requires SCO approval?
  • Which official approves the JA for actions between $750,000 and $15,000,000?
  • Who approves the Acquisition/Contract Strategy for values greater than $93 million?
  • Which module should contracting officers use to post solicitations, attachments, and amendments?
  • Which market research technique involves querying a government-wide database of contracts and procurement instruments?
  • Who signs the warrant for an Administrative Contracting Officer?
  • Which procedure is used for procurements under FAR Part 13?
  • Which term describes minor issues discussed prior to establishing the competitive range to improve understanding of proposals?
  • Which of the following is a technique to promote early exchange of information with industry?
  • Under IAW UAI, if a Civil Works contract exceeds the IGE by 25%, which authority approves?
  • Threshold and approval for D&F 'Contract Type - Incentive Contracts'
  • Which COR designation corresponds to the most complex and high-risk contracts?
  • Posting solicitations and related documents via PIEE will automatically transmit to which system?
  • Which statement describes Design-Bid-Build?
  • Which entity is primarily responsible for evaluating proposals in the Source Selection process?
  • Threshold and approval for determination of consolidation.
  • Expired appropriations have what characteristic?
  • Who is delegated the authority under DFARS 215.371 to waive the requirement to resolicit for an additional period of at least 30 days?
  • Penalties for a violation of the ADA may include which of the following?
  • Two-phase design-build selection procedures threshold references include which documents?
  • What are the two broad categories used to group government contract types?
  • Which regulations govern ratification of unauthorized commitments?
  • What is an unauthorized commitment and who ratifies unauthorized commitments exceeding $100,000?
  • For acquisitions valued between 10 million and 100 million, who has approval authority?
  • Which document designates the ACO for each contract?
  • Which item represents a D&F responsibility criterion?
  • What happens to proposals not included in the competitive range?
  • Can you award a contract to an offeror other than the SSA's recommended choice?
  • Which statement best contrasts Progress Payments and Performance Based Payments?
  • Which order type is used to procure services?
  • Which statement correctly describes unilateral option exercise?
  • What is the threshold for requiring certified cost or pricing data?
  • Which of the following is the minimum posting duration for J&As?
  • What is the purpose of the Request for Services Contract Approval form?
  • Where is the contracting officer authority defined?
  • What is the purpose of the Bona Fide Need Rule in obligations and appropriations?
  • If leadership directs actions contrary to your legal guidance, what is the proper course of action?
  • Threshold and approval for D&F 'Contract Type - Cost-Reimbursement'
  • For a contract estimated at $350M, who is the appointing authority for source selection?
  • Which reference group is cited for Acquisition Strategy threshold for not-performance-based services?
  • Which statement best captures the distinction between 'Responsive' and 'Responsible' bidders?
  • What must the SSP address regarding PLA?
  • Which statement reflects a key to effective competition?
  • Which action is NOT within the COR's authority?
  • In the Two-Phase Design Build Selection Procedure, which statement is true?
  • Which FAR Part covers consolidation?
  • What is the purpose of MATOC in the context of multiple award task order contracts?
  • What is the difference between SAT and SAP?
  • Synopsis is required if the action threshold is exceeded by how much?
  • Under FAR 12.603, when a written solicitation will be issued, what procedure is used to reduce the time required to solicit and award contracts for the acquisition of commercial items?
  • In a civil works procurement where proposals are double the IGE but within 1% of each other and the SSA discounts the IGE, what should the Contracting Officer do?
  • Which statement correctly describes non-severable service contracts under the Bona Fide Need Rule?
  • Where is the documents review and approval matrix located?
  • In a post-award debriefing, which item is typically disclosed?
  • Under the Bona Fide Need Rule, when is the bona fide need for supply items determined?
  • Issuing a letter authorizing expenditures before funds are available would be anti-deficient.
  • Under multiple-awards contracts, an order must exceed what amount to require fair opportunity, unless exceptions apply?
  • During which stage must the proposed use of a PLA be evaluated?
  • Which of the following is an example of a non-severable contract?
  • FAR Part 36 covers which type of contracts?
  • Which document lists the threshold for Acquisition Strategy for not performance-based services?
  • What statement is true about costs in a contract: allocable vs allowable?
  • What penalties may result from a willful Anti-deficiency Act violation?
  • Who signs the designation letter for each contract the ACO is involved with?
  • BCOES stands for which of the following?
  • Which item is listed as an example of an end item under the Berry Amendment?
  • What is the micro-purchase threshold?
  • Under fixed-price contracts, when is incremental funding permissible?
  • Which would not be considered an Excusable Delay?
  • What is the usual threshold for J&A signed by the alternate SCO?
  • Which J&A type is posted with the solicitation?
  • Who is responsible for the compliance review?
  • In a full and open competitive negotiated acquisition, what two criteria determine which proposals are placed in the competitive range for discussions?
  • Under 13 CFR 124.506b, what is the sole-source threshold for ANC 8(a) companies without and with J&A?
  • Which market research technique involves early engagement with potential offerors through structured discussions?
  • How does a contractor indicate acceptance of a purchase order?
  • For Design Bid Build, what are the required synopsis and solicitation posting days?
  • For a formal IGE over the SAT, which item is NOT a stated requirement?
  • Which FAR provisions are cited for the 8(a) sole-source justification?
  • In CPARS performance assessments, which attributes contribute to a high-quality CPARS entry?
  • SCO stands for which role in contracting?
  • What avenue of recourse do contractors have when they feel they are owed additional time or are entitled to damages from the Government on a contract?
  • In appropriation constraints, Bona Fide Need refers to what?
  • In a sole-source procurement with a single offer and a 30-day receipt period, what action must the contracting officer take to determine if the offered price is fair and reasonable?
  • What is a bridge contract and why is it a concern?
  • Which of the following is NOT an element of an IGE?
  • What does NTE stand for in this context?
  • An Acquisition Strategy document is required for Army service acquisitions greater than the Simplified Acquisition Threshold. How is the approval authority determined?
  • Under a Blanket Purchase Agreement, when is money obligated?
  • When acquiring commercial items, which contract types are normally used and which are prohibited?
  • When should UCA/Letter Contracts be used?
  • Which determinations must be made prior to exercising an option?
  • Which statement best describes the difference between price analysis and cost analysis?
  • What is the main purpose of the post award conference/orientation/start to work meeting?
  • Which statement best defines a responsible contractor?
  • Under which conditions are vendors ranked?
  • Statutory fee limitation for design by an AE form on a GOV contract, and what is included?
  • Is a J&A required for brand-name or equal specifications?
  • Under FAR 15.404-1(a)(3), which statement accurately describes when to use cost analysis and price analysis?
  • Under J&A posting requirements, the justification must be publicly available within how many days after contract award, except for certain circumstances?
  • What is the Simplified Acquisition Threshold (SAT) in the contingency contracting thresholds?
  • If unauthorized changes are made by unauthorized personnel, who must be notified?
  • What is consideration?
  • What does D&F stand for in contracting practices?
  • The SSEB documents its decision in which document?
  • Under what cost threshold is the use of operating and maintenance (O&M) funds for construction allowed?
  • When an acquisition contains brand name specifications, what must the contracting officer include with the solicitation?
  • What defines a latent defect?
  • Who has the authority to exempt from the use of the Uniform Contract Format (UCF) in individual contracts?
  • Urgent and Compelling J&A posting timeframe?
  • Which is a possible penalty under the Anti-deficiency Act?
  • In Phase Two, what may be included with technical proposals?
  • Kick-off meeting timing occurs how many days before the start of performance?
  • Under a UCA, you may not obligate more than what percentage of the NTE?
  • Who is typically the command SCO?
  • Waivers for OCI are referenced under which FAR provision?
  • Under IAW UAI, if an O&M construction award exceeds the IGE by 15%, who approves?
  • In simplified acquisitions, which scenario establishes a binding contract?
  • Which statement about NTE inclusion in a UCA is true?
  • One-step selection procedure is authorized for military construction projects under what conditions?
  • In contract formation, which two elements must consideration have?
  • Which statement about GFP disposition at contract end is correct?
  • Which statement describes an active appropriation?
  • Which statement best characterizes clarifications, communications, and discussions during a competitive source selection?
  • Under which contract actions is a Command Service Executive (CSE) Memo required?
  • Which exception allows DoD agencies to obligate funds at contract award to finance a severable service contract with a period of performance not to exceed 12 months?
  • What are liquidated damages and when can they be used?
  • Which documents specify the Acquisition Strategy thresholds?
  • Why is it important to assure FPDS-NG Contract Action Reports (CARs) are complete and accurate?
  • Which element is required for an Urgent and Compelling J&A and must be posted within 30 days of contract award?
  • When should the Service Contract Approval Form be included in the contract file?
  • Which option correctly lists the four items to determine when a CSE Memo is required—viewed for planning and approval coordination?
  • Why is contract closeout important?
  • Threshold and approval for D&F for 'Other than full and open competitions for International Agreement competitive restriction'
  • Under Lowest Price Technically Acceptable (LPTA), which statement best describes when LPTA is appropriate?
  • Where do you find contracting by negotiation in the UAI?
  • FF&E stands for what in building projects?
  • Which factor is commonly considered in an emergency acquisition?
  • Which statement best describes the Anti-deficiency Act (ADA)?
  • Threshold and approval for D&F for 'Justification of Contract Type - Award-Fee Contracts'
  • Which statement about CAS is correct?
  • Which statement best describes the elements of a legally binding contract?
  • Which technique involves reviewing catalogs and other generally available product literature?
  • When is a detailed IGE required?
  • Threshold and approval for D&F for 'Use of Time and Material (T&M) Contract and Labor-hour Contract prior to execution of the base period or any option periods of three years or less'
  • Which step follows 'Conduct initial proposal evaluations' in the Source Selection Procedures?
  • Which statement about UCA approvals is true?
  • Which statement best describes a Trade-Off approach in procurement?
  • What is an unauthorized commitment?
  • MATOC meaning
  • How many days does a cure notice grant the contractor to cure the deficiency?
  • When must the Davis-Bacon/Wage Determination be pulled?
  • What are the three types of indefinite-delivery contracts and what is the use for each type?
  • Which of the following is a factor that may justify termination for default?
  • The Administrative Contracting Officer under USACE must be which type of employee?
  • What is a Delivery Order used for?
  • Which statement best describes the difference between Acquisition Plan and Acquisition Strategy?
  • Which analysis is used to evaluate total price without examining the individual cost elements and is required for all acquisitions?
  • Which three limitations must be checked prior to making new obligations?
  • What does BCOES evaluate?
  • If leadership direction conflicts with mandatory legal guidance, what is the proper course of action?
  • Which FAR clauses define a personal services contract?
  • Why is the commerciality determination important?
  • How do you determine whether a change is within the scope of the contract?
  • If the PCO is not SSA, who appoints the SSA for contracts under $100 million?
  • Which regulations govern the Price Negotiation Memorandum (PNM) requirements?
  • Which clauses caution the contractor that costs cannot be incurred beyond the amount allotted and that the Government is not obligated to pay beyond that amount?
  • Which of the following is NOT a PDBP phase?
  • Which FAR Part covers Cost Accounting Standards (CAS)?
  • Why is CPARS data used by other PCOs?
  • Which training tools are recommended for a new Contract Specialist to accomplish duties?
  • What is included in a Stop Work Order?
  • Which documents should the Procuring Contracting Officer review to determine if a change is within the scope of the contract?
  • What is the typical monetary limit for an ACO's authority to administer construction contracts and modifications?
  • Where in the contract can site visit information be found?
  • What is the first step a Contracting Officer should take when the COR reports that services were not performed?
  • For an estimated contract value of $120,000,000, who is the SSA appointment?
  • Offeror experience and past performance are distinguished by which principle?
  • According to FAR 10.002(b)(1), how long is market research considered relevant?
  • Describe the difference between a Statement of Work (SOW) and a Performance Work Statement (PWS) and when each is appropriate.
  • Organizational Conflict of Interest (OCI) written analysis to avoid, mitigate, or neutralize a potential or actual OCI has what threshold?
  • In a fiscal year end purchase with no funds available, what must be obtained before proceeding?
  • Which option is a valid alternative to finalizing a PWS when the PDT struggles to draft a proposal?
  • Under DFARS 201.602, a COR is required for which condition?
  • What must be done before selecting LPTA for construction projects under NDAA Sections 813 & 822?
  • Pre-award debriefings must include which of the following at a minimum?
  • Which of the following is NOT one of the seven exceptions to full and open competition?
  • For commercial item acquisitions under FAR 12.207, which contract types are acceptable?
  • Which statement describes an inherently governmental function?
  • If a contractor is listed on the List of Parties Excluded from Federal Procurement and Non-procurement Programs, what is the rule on continuation of current contracts with the contractor?